Draft Supplemental Environmental Assessment for Waterfront Repairs at U.S. Coast Guard Station Monterey, Monterey, California

Overview

ID #

13245883

Document Type

Supplemental Environmental Assessment

NOAA Office

National Marine Fisheries Service - Headquarters

Document Status

Complete

Last Updated

06/28/2019

Summary

NMFS has received a request from the U.S. Coast Guard (USCG) for authorization to take marine mammals incidental to pile driving activities for waterfront repairs at the USCG Monterey Station in Monterey, California. The proposed replacement of the 17 timber piles requires removal of the existing
approximately piles (16 to 18 inches in diameter), using a vibratory extractor. Each timber pile will be replaced with a 14-inch steel pipe pile installed using a vibratory hammer.

Proposed IHA must be issued in August. Permit must be provided to applicant by October 16, 2017