Overview
ID #
13245889
Document Type
Environmental Assessment
NOAA Office
Office of the Chief Administrative Officer
Document Status
Complete
Last Updated
09/06/2017
Summary
To meet space demands, GLERL intends to demolish and rebuild Building #3 for use as additional laboratory, administrative, maintenance, and storage space. The current building is a one-story 2,500 square feet (sf) pre-engineered steel building constructed in approximately 1969 and used for storage and laboratory space. The proposed new structure will occupy the same building footprint but double the size to roughly 5,000 sf by addition of a second story. The proposed action includes the demolition of the existing building, with the possible exception of the exterior foundation walls.
Construction project is expected to be initiated in FY18